Back to list

How is the maintenance time of a roll forming machine divided?

2021-11-09

How is the maintenance time of a roll forming machine divided?

The inspection and maintenance time of the plate rolling machine should be divided according to the equipment operating status and maintenance level:

Daily Maintenance
Daily Maintenance: After work, clean the dust and oil stains on the surface of the equipment, check the lubrication parts and add lubricating oil, tighten loose bolts, and clean the dust in the electrical box.
Weekly Maintenance: Conduct a short-term trial run to check the equipment's operating status and potential faults.
Regular Inspection
Level 1 Maintenance (Monthly): Completed by maintenance personnel, checking structural components, pipeline sealing, oil pump and motor operating status.
Level 2 Maintenance: Arranged according to actual usage, focusing on checking the transmission system, hydraulic system and electrical components.
Overhaul Cycle
The overhaul cycle of mechanical equipment is usually measured by the total operating time of the machine. For example, the overhaul cycle of ultra-high-pressure compressors is set at 48 months, but the overhaul cycle of plate rolling machines needs to be determined according to the specific equipment parameters and manufacturer's recommendations.

NEXT: